An Assessment of Wind Characteristics,Performance Characterization and Availability of Site Specific Wind

Zahid Hussain Hulio  
【摘要】:Renewable energy is expanding throughout the world rapidly.However,the wind energy technology has been facing some serious issues,especially the immature failure of mechanical and electrical components.The immature failures have effects on wind energy technology,for example,increasing the cost of repair and replacement,minimizing the availability and performance that could be the cause of increasing cost of energy.Therefore,the performance and availability are key issues that need to be addressed.The wind characteristics assessment is essential for near reality assessment of increasing performance and availability of wind farms.In this thesis,three specific sites are selected which representing the wind class 3 and 7.The main contents and results of this thesis are enumerated as:(1)The wind characteristics,including wind speed,direction and other meteorological data of Nooriabad,Pakistan is studied for a period of a year.The wind energy density,annual energy output and capacity factors have been calculated at two referenced heights 30 and 50 m.The empirical,maximum likelihood,modified maximum likelihood,energy pattern and graphical methods were used to determine the Weibull and other dependent parameters.The correlation coefficient and root mean square error values were used to assess the accuracies of methods.The results show that graphical method does not fit well except all other methods fit well with the measured wind speed.The observed frequency distribution showed that Weibull distribution gave better fitting than Rayleigh distribution.The results show that the Nooriabad site has potential to install utility wind turbines to generate energy at the lowest cost per kWh at 50 m height.(2)The wind climate parameters,performance functions and reliability assessment model have been developed.The developed model encompasses local wind characteristics assessment including wind shear and diurnal wind variations.The performance assessment is based on technical and real availability,capacity factor and failure rate of mechanical and electrical components.The Weibull method is used to determine the reliability.The novel maintenance model was developed for improving the reliability and performance of wind farm.Also energy volume and financial constraints model were developed.(3)The onsite wind farm performance assessment model and performance based cost model have been developed.The average values of wind characteristics using entire data set,showed the strong presence at the hub height of wind turbine.The power coefficient is dropped when wind speed crosses the rated speed.So,the efficiency of wind turbine is decreased at an increased wind speed.Tip speed ratio shows that a wind turbine operating close to optimal lift and drag that will exhibit the performance level.The assessment showed that the wind turbine performs better at below the rated speed.The estimated average levelized cost of energy makes it competitive to other energy technologies.(4)The site specific wind assessment is necessary to ascertain the influence of natural variation of wind climate parameters on wind turbine and energy production.The objective is to study the natural variation of wind parameters and their effects on energy generation and on wind turbine components.The weight model has been developed to determine the effects on wind turbine components,energy generation and on pre and post effects of model on energy cost.The result shows that site specific wind force gave rise on wind turbine which ultimately became cause of drop in energy.The lift coefficient,drag coefficient and pitching moment considering values showed an increase in force that results drop in energy.The cost assessment shows that the cost of energy generation was increased.The results show that the Hawkes bay in Pakistan has potential to generate the energy at the lowest cost/kWh but needs design adjustment in wind turbines accordingly.The studied sites fall under the wind class 3 and 7 showed the strong presence of wind characteristics.The precise determination of wind characteristics for each wind class is essential for installation of wind farms.The site specific wind characteristics and their correlation showed that wind environment has significant influence on performance and availability of wind farms.The results of site specific assessment pave the way for site specific design optimization of wind turbines.


知网文化
【相似文献】
中国期刊全文数据库 前19条
1 Zhen LI;Shisheng ZHONG;Lin LIN;;An aero-engine life-cycle maintenance policy optimization algorithm: Reinforcement learning approach[J];Chinese Journal of Aeronautics;2019年09期
2 李勇;徐玉国;王少华;;Machinery and Equipment Maintenance Strategy and Choice[J];Journal of Donghua University(English Edition);2018年03期
3 Yiwei WANG;Christian GOGU;Nicolas BINAUD;Christian BES;Raphael T.HAFTKA;Nam H.KIM;;A cost driven predictive maintenance policy for structural airframe maintenance[J];Chinese Journal of Aeronautics;2017年03期
4 Ali Gerami Matin;Reza Vatani Nezafat;Amir Golroo;;A comparative study on using meta-heuristic algorithms for road maintenance planning:Insights from field study in a developing country[J];Journal of Traffic and Transportation Engineering(English Edition);2017年05期
5 张林雪;秦进;贺钰昕;叶勇;倪玲霖;;Network-level optimization method for road network maintenance programming based on network efficiency[J];Journal of Central South University;2015年12期
6 卢昱;晏杰;韩震;古平;;Construction Research of Maintenance Support System[J];Journal of Donghua University(English Edition);2015年06期
7 徐庆征;郭乐勐;王娜;费蓉;;Recent Advances in Selective Maintenance from 1998 to 2014[J];Journal of Donghua University(English Edition);2015年06期
8 Huaiyuan Li;Hongfu Zuo;Kun Liang;Juan Xu;Jing Cai;Junqiang Liu;;Optimizing combination of aircraft maintenance tasks by adaptive genetic algorithm based on cluster search[J];Journal of Systems Engineering and Electronics;2016年01期
9 黄立军;陈宇;马沂荩;吴进;;Reliability-Centered Maintenance-Based Maintenance Decision in New Nuclear Power Plants[J];Journal of Donghua University(English Edition);2016年02期
10 崔妍;陈世均;瞿勐;;Research and Application of Maintenance Decision Method of Complex Equipment in Nuclear Power Plant[J];Journal of Donghua University(English Edition);2016年02期
11 蔡志强;赵江滨;司书宾;刘晓培;;Modeling and Application of Maintenance Bill of Materials for Complex Equipment[J];Journal of Donghua University(English Edition);2016年02期
12 赵湘;陈罡;岳强斌;;Efficiency Evaluation for the Annual Equipment Maintenance Based on Set Pair Analysis[J];Journal of Donghua University(English Edition);2016年02期
13 蔡志强;李洋;张帅;周文宝;;Maintenance Decision Making Model with Multiple Attribute Optimization[J];Journal of Shanghai Jiaotong University(Science);2016年04期
14 Xinqing Gao;Fan Yang;Chao Shang;Dexian Huang;;A review of control loop monitoring and diagnosis:Prospects of controller maintenance in big data era[J];Chinese Journal of Chemical Engineering;2016年08期
15 Qing-zheng XU;Le-meng GUO;He-ping SHI;Na WANG;;Selective maintenance problem for series–parallel system under economic dependence[J];Defence Technology;2016年05期
16 祁鑫;Zuo Decheng;Zhang Zhan;Yang Xiaozong;;Importance measure based optimal maintenance policy for deteriorating components[J];High Technology Letters;2014年01期
17 郭俊锋;芮执元;冯瑞成;魏兴春;;Imperfect preventive maintenance for numerical control machine tools with log-linear virtual age process[J];Journal of Central South University;2014年12期
18 Kristen R Dearing;Ashish Sangal;Glen J Weiss;;Maintaining clarity:Review of maintenance therapy in nonsmall cell lung cancer[J];World Journal of Clinical Oncology;2014年02期
19 Huimin Lv;Min Yan;Mengwei Zhang;Limin Niu;Huiai Zeng;Shude Cui;;Efficacy of capecitabine-based combination therapy and singleagent capecitabine maintenance therapy in patients with metastatic breast cancer[J];Chinese Journal of Cancer Research;2014年06期
中国重要会议论文全文数据库 前10条
1 Xianwei Wang;Hui Peng;Haiming Wei;Rui Sun;Zhigang Tian;;Memory formation and long-term maintenance of IL-7Rα~+ILC1s via a lymph node-liver axis[A];第十三届全国免疫学学术大会摘要汇编[C];2018年
2 Bing Zhu;;Establishment and maintenance of epigenetic modifications[A];第十一次全国基因功能与表观遗传调控学术研讨会摘要集[C];2015年
3 ;Configurable integrated maintenance system based on digital production model[A];Proceedings of 2010 Chinese Control and Decision Conference[C];2010年
4 ;Single-agent maintenance therapy in non-small cell lung cancer:a systematic review and meta-analysis[A];中华医学会第五届全国胸部肿瘤及内窥镜学术会议论文汇编[C];2011年
5 ;Research on Lash-up Maintenance Technology of Engineering Equipment[A];Information Technology and Computer Science—Proceedings of 2012 National Conference on Information Technology and Computer Science[C];2012年
6 Song Yunxue;Li Zongbo;;Research on the Evaluation Method of Aircraft Virtual Maintenance Training Based on AHP[A];2012年计算机应用与系统建模国际会议论文集[C];2012年
7 Bing Zhu;;Establishment and maintenance of histone modifications[A];中国生物化学与分子生物学会第十一次会员代表大会暨2014年全国学术会议论文集——专题报告三[C];2014年
8 Bing Zhu;;Establishment and maintenance of histone modifications[A];第二届全国发育生物学大会论文集[C];2014年
9 Judith Strong;Johanna Meij;;Role of Sip30 in the development and maintenance of peripheral nerve injury-induced neuropathic pain in rats[A];中国神经科学学会第六届学术会议暨学会成立十周年庆祝大会论文摘要汇编[C];2005年
10 ;OPTIMIZATION ON MAINTENANCE CYCLE FOR POWER PLANT EQUIPMENT BASED ON PROBABILISTIC RISK ASSESSMENT[A];2006年中国机械工程学会年会暨中国工程院机械与运载工程学部首届年会论文集[C];2006年
中国博士学位论文全文数据库 前5条
1 Zahid Hussain Hulio;[D];大连理工大学;2019年
2 孟炎;价值观与领导行为及绩效的关系[D];哈尔滨工业大学;2015年
3 王慧颖;基于延迟时间理论的预防维修决策模型及应用研究[D];北京科技大学;2016年
4 黄立新;智能电网条件下输电检修优化模式与实施方案研究[D];华北电力大学;2013年
5 夏唐斌;面向制造系统健康管理的动态预测与预知维护决策研究[D];上海交通大学;2014年
中国硕士学位论文全文数据库 前10条
1 AFOLABI OLUFISAYO MERCY;优化铁路维修操作的模型:道岔/开关[D];北京交通大学;2019年
2 Nicolas Chaucheprat;基于成本、可用性的串行生产系统维护策略研究[D];上海交通大学;2018年
3 Berhe Haile Gebreselassie;[D];湖南大学;2017年
4 Owusu Ampaw Eugene Ansah;[D];北京交通大学;2018年
5 刘杰(Bobby Kurniawan);以可靠性为中心的维护实施在化工行业的分析研究[D];清华大学;2016年
6 ACHOUR HOUSSEM EDDINE;面向计算机辅助维护管理系统的预诊方法研究[D];哈尔滨工业大学;2016年
7 潘明慧;基于精益管理的小型商品车运输企业运营管理优化研究[D];广东外语外贸大学;2016年
8 王玥;汉语信息型文本英译探析[D];中南大学;2012年
9 戴维斯;移动约束群组AdHoc网络研究[D];华中科技大学;2009年
10 李硕;延长C_(64K)型铁路货车检修周期可行性研究[D];中国铁道科学研究院;2014年
中国重要报纸全文数据库 前2条
1 世界银行可持续发展局(中国和蒙古业务) 任斌 范红 世界银行可持续发展局 Paul Amos;以往成就和未来方向(下)[N];中国交通报;2013年
2 易水;新词集锦[N];计算机世界;2005年
中国知网广告投放
 快捷付款方式  订购知网充值卡  订购热线  帮助中心
  • 400-819-9993
  • 010-62982499
  • 010-62783978